Need 54kw control system

Post by FractionalDisMan »

Please see viewtopic.php?f=85&t=70225
FractionalDisMan wrote:I need a 53kw electric still control. The spec below. Something like http://distillerycontrols.com/integrate ... ol-center/" onclick="window.open(this.href);return false;" rel="nofollow. I tried to get http://distillerycontrols.com/" onclick="window.open(this.href);return false;" rel="nofollow to quote but I think they are out of business. I emailed 3 times and got no reply. Any one have another company that does this sort of thing?

Power in:
2 each
70A 3 phase Y (208v)
(140A total. Must be wired split into two 70A)

Heaters:
12 each
4400w, 240v
I will hard wire, no plugs
Pot Control:
Timmed/delayed start (for preheating mash)
PID temp control, RTD input
Manual power control
High alarm

Mixer Motor:
1 each
5 HP, 3 phase
Speed control (simple VFD)
Will hard wire to motor, no plugs
On/Off

Wash Pump:
1 each
3 HP, 3 phase
Will hard wire, no plugs
On/Of Control

Dephlegmator Control
1 each 24vdc solenoid valve, NO
1 each 24vdc solenoid valve, NC
Control:
Both solenoids are on for cooling
PID temp control, RTD input

Other:
2 each temperature readouts, no control, high alarm, RTD input
1 programmable timer with alarm
GFI protection on heaters
Circuit overload protection on heaters
Circuit overload protection on motors
Electrical cabinets (gray, steel)
User avatar
Single Malt Yinzer
Trainee
Posts: 974
Joined: Fri Sep 23, 2016 3:20 pm

Re: Need 54kw control system

Post by Single Malt Yinzer »

http://stilldragon.com/" onclick="window.open(this.href);return false;" rel="nofollow

http://distillery-equipment.com/" onclick="window.open(this.href);return false;" rel="nofollow

Either one should be able to provide what you need or something close.
hpby98
Site Donor
Site Donor
Posts: 314
Joined: Thu Jun 01, 2017 3:38 pm
Location: New Zealand

Re: Need 54kw control system

Post by hpby98 »

53kw is 53,000 Watts

Do you mean 5300 Watts, aka 5.3kw?
User avatar
Danespirit
Site Donor
Site Donor
Posts: 2647
Joined: Tue Dec 25, 2012 8:09 am
Location: Denmark

Re: Need 54kw control system

Post by Danespirit »

hpby98 Nope, I think he means what he writes 12 elements at 4400 W each is just shy of 53 KW.

He's posting in the section for craft distillers, this won't be a hobby scale rig.
User avatar
Bushman
Admin
Posts: 18011
Joined: Tue Mar 30, 2010 5:29 am
Location: Pacific Northwest

Re: Need 54kw control system

Post by Bushman »

I've never dealt with Swede but he has been around for a long time making controllers. Not positive but I think he lives in Canada.
User avatar
cede
Site Donor
Site Donor
Posts: 363
Joined: Wed Jan 12, 2011 6:39 am
Location: Canada

Re: Need 54kw control system

Post by cede »

Yep Swede is in Canada.
Pikey
Site Donor
Site Donor
Posts: 2444
Joined: Sun Oct 16, 2016 3:29 pm
Location: At the edge of the Wild Wood

Re: Need 54kw control system

Post by Pikey »

WTF - This BS is way outside "hobby" level - and all these cross references cast a little more suspicion !
User avatar
shadylane
Master of Distillation
Posts: 10407
Joined: Sat Oct 27, 2007 11:54 pm
Location: Hiding In the Boiler room of the Insane asylum

Re: Need 54kw control system

Post by shadylane »

Don't get your panty's in a bind. This is the "Craft Distillers" section :lol:
User avatar
HDNB
Site Mod
Posts: 7365
Joined: Mon Feb 17, 2014 10:04 am
Location: the f-f-fu frozen north

Re: Need 54kw control system

Post by HDNB »

a bit big for hobby. we'll consider this asked and answered with a lock instead of delete.

Post your credentials in sig line with link to your distillery and i'll open it again in craft distillers topic.
I finally quit drinking for good.

now i drink for evil.
User avatar
HDNB
Site Mod
Posts: 7365
Joined: Mon Feb 17, 2014 10:04 am
Location: the f-f-fu frozen north

Re: Need 54kw control system

Post by HDNB »

i'm reopening in craft distilling after discussion with the OP. I think there are people here that can and will help with the source of the equipment required for the goal.
electric equipment is not a problem from my perspective.


It is a craft distillery we are talking about and OP is the installing contractor, not the owner, so he is not at liberty to post the name and DSP.
I finally quit drinking for good.

now i drink for evil.
User avatar
Saltbush Bill
Site Mod
Posts: 9750
Joined: Thu Mar 17, 2011 2:13 am
Location: Northern NSW Australia

Re: Need 54kw control system

Post by Saltbush Bill »

Swede would be the bloke to see. Id try and contact him again, doubt hes gone out of business.
FractionalDisMan
Novice
Posts: 31
Joined: Mon Sep 27, 2010 3:42 pm

Re: Need 54kw control system

Post by FractionalDisMan »

Well I could never get any reply to inquires to build the system. I ended up building myself. Got all parts from Automation Direct. Control is a Productivity 2k PLC. System working good. Needs some fine tuning on the automatic controls and recipes. I wired the heaters into 4 banks of three heaters connected in a delta configuration. I put a third SSR on each bank for safety. Each bank is burst fire time base control. I delayed the turn on time of each bank 1/4 of the time base. This way the heaters turn on is staggered so the heaters do not turn on and off all at the same time. Two Industrial GFIs monitor the heaters for current leakage. Mixer speed control is a VFD also from AD. Wash motor and mixer protected w/ overload breakers. Delay auto start, Run until, etc all programed in. Display he went with the 15" touch screen. Down the road will add logging and remote monitor and control w/ phone. The unit is installed in a licensed system in California. No names until the doors open.
Attachments
05.jpg
User avatar
cede
Site Donor
Site Donor
Posts: 363
Joined: Wed Jan 12, 2011 6:39 am
Location: Canada

Re: Need 54kw control system

Post by cede »

Nice Job ! :)
Post Reply