building vm reflux still, and got a few quickies

Putting older posts here. Going to try to keep the novice forum pruned about 90 days work. The 'good' old stuff is going to be put into appropriate forums.

Moderator: Site Moderator

Post Reply
piratesteve
Novice
Posts: 80
Joined: Thu Apr 09, 2009 6:29 am
Location: canadian eh!

building vm reflux still, and got a few quickies

Post by piratesteve »

1. when im putting my reflux centering plate in, the easiest wat to do this will be to slot my 2" copper pipe so the plate will slide in and then solder????

2. with the reflux centering, does it matter if the surfaces or not completely smooth? as I am using 2"copper test ens, as they are easy to cut and very thin, but they are stamped.

3.For my packing, I have a roll of structured copper from brewhaus, how tightly should the packing be in the tube? (ie. loose or tight or somewhere in the middle)

thanks for the help. played hookey from work to get this thing set up, and cant wait to fire it up tomorrow, as i have a nicely cleared sugar wash(100L) to christen it with.
I was sober this morning, 'til I woke up this afternoon

This topic has 1 more reply

You must be a registered member and logged in to view the replies in this topic.


Register Login
 
Post Reply