2" column with 42" of stainless scrubbers below the VM T section. The T is an equal 1.4" to increase vapour speed and aid in vapour spliting. Above the T it expands back to 2" with another 12" of packing under the reflux condenser. There is a separate 1/2" CM output port which will feed its own liebig.
Reflux condenser will have two coolant flow controls. I is preset so that at low boiler power - say 700w with the VM valve shut it operates at 100% reflux to concentrate the heads. A slight increase in boiler input will bleed the heads off through the CM output port. Then open the second coolant valve to re stabilise the column whilst the boiler increases to VM power level.

There are two centering funnels at 12" and 36". The upper one is just below a thermometer port. The probe is shielded from drips and sits in a void in the packing.




Now that I have seen it in situ, I will be fitting the VM valve after the 2nd thermometer port in the horizontal branch off the T. I ditched the 3rd temp port up near the reflux condenser as being unneccesary. Have not decided about the compression union to join the 2 sections together. I might instead use a slip coupling sealed with distillers tape. That 2" union is much stronger though and the upper section is fairly heavy.
There will be a 12" or so drop in the 1.4" that will reduce in steps before it gets to the product liebig. That will be on its own coolant supply. It should work OK I think.