Reflux Project need advice
Moderator: Site Moderator
-
Rooster Cogburn
- Novice
- Posts: 12
- Joined: Wed Apr 24, 2013 4:06 pm
- Location: Sierra Nevada Mountain Range
Reflux Project need advice
Decided to spend a little time on the still today, most of my time was spent cleaning the pipe. I ended up using 400 grit wet-dry sandpaper and 600 grit scotch-bright.I managed to cut down what I call the diverter, I cut it down as small as possible so I could get the maximum vapor flow, next I ground down the inside notches of the reducer in order for the 1 inch pipe to pass through. ended up cutting the 2inch pipe to size and finished cleaning up all the parts, with a little luck it might just fit.I could use a little advice on a good way to hook up water lines to the 1/4 inch condenser tubing and was also wondering if 1/4 inch tube will be big enough to use as a product valve?
You do not have the required permissions to view the files attached to this post.
Last edited by Rooster Cogburn on Wed May 01, 2013 11:31 am, edited 3 times in total.
"You can't lock up a man's whisky!"