Initially I was going to buy an off the shelf from Mile High, but decided I could build a CCVM for almost the same $ and that's what I wanted. So, last night I ordered all of my 2" spools, 1x 24", 1x 12", 1x sight glass, 1 x 3way T., 1x 90* Elbow and 1x 6". I also ordered a 10 pack of the 2" TC clamps and 10 pack of the teflon gaskets. Now, I think, I only need the Reflux condenser and the product condenser. Q#1, is a dephlegmator and shotgun the same thing? Q#2, how do you attach a Leibig to the T, is there a 2" to .5" reducer? Q#3, If making a Liebig condenser can you use PVC for the jacket? Q#4, for the reflux condenser, I'm not very handy, but I think I could make one with CSSP, what is required?
FYI, I'm going to use either my Anvil 10.5, or a 15 gal keg with propane for the boiler.
Feedback appreciated and thanks in advance.
