This was my second Potty build . The first was a small
3/4” over 1/2” . This one was intended for a friends Hubby but I decided it was too good and kept it for myself and made him a slightly lesser model .

As I distill mostly on gas , the thinking was to keep the collection end as far away as possible .
My first Pot still had hoses at each end ….. as most Liebigs do , but the one near the keg git scorched on a few occasions and the one near the product was too close to the collection area and always got in the way .
So I stole an idea from Stubbydrainer in CCSC and brought the coolant lines back to a safe place and added a control valve there . On my original Liebig , I had no local control if flow and had ti run to the tap to adjust flow .
So it was born . 1” over 3/4” . 1.6 metres if jacketed section .
Crimped inner tube and spiral wrapped to encourage efficient coolant flow I had to braze up some brackets to support the coolant lines to where I wanted . I used liquid paper as a mask to stop the braze running and avoid later cleanup.
I use garden hose fittings so I brazed then up at the same time . Note the big block of Pumas …… thats a trick I learned from my Dad . Its great to hold stuff while you braze it .
So here are all the bits ready for assembly . I added a ring of cork inside the brackets to insulate the coolant lines from the still ….. its probably a mute point …. but hey . Lucky point was that the copper tube cutter kinda forms a lip on the tube so it holds the cork in place .