new keg build, pictures

In our view 30 gallons and under is considered hobby size. Do not bring anything larger than this to our site.

Moderator: Site Moderator

planohog
Swill Maker
Posts: 381
Joined: Mon Jun 17, 2024 2:18 pm
Location: Gulf_of_America

Re: new keg build, pictures

Post by planohog »

Water boil test=[PASS]
the solder joints look like me, terrible but they will work for now.
looks like I get 23 amps out of it. Perfect for a 30 amp service.
waiting on drain parts now, then, I can wait for fall and cooler water temps.
Till then ill keep polishing on it. and a vinegar run and a sacrificial sugar run.
I have always had a special place for strippers , this one can stay in the house.

Many thanks to the little lady for allowing me to take over the laundry area and kitchen table for a few days.
Screen Shot 2025-08-18 at 8.36.38 PM.png
IMG-1171.jpg
IMG-1177.jpg
IMG-1178.jpg
IMG-1182.jpg
You do not have the required permissions to view the files attached to this post.
User avatar
acfixer69
Global moderator
Posts: 5305
Joined: Mon Dec 20, 2010 3:34 pm
Location: CT USA

Re: new keg build, pictures

Post by acfixer69 »

Is there enough space for the clamps? They look very close. Glad the flux arrived and worked as it should.
planohog
Swill Maker
Posts: 381
Joined: Mon Jun 17, 2024 2:18 pm
Location: Gulf_of_America

Re: new keg build, pictures

Post by planohog »

yes It should work, I used them to layout the arrangement, before I cut the holes.
I should have bolted them all on and took a look see. Ill save that for tomorrow. That flux REALLY WORKS,
i found out you can use the acid brush to help move the solder around too. I very happy and thanks to everyone
that shared tips and tricks along the way.
User avatar
Tammuz
Rumrunner
Posts: 671
Joined: Sat Sep 21, 2024 11:59 am

Re: new keg build, pictures

Post by Tammuz »

Next soldering job you can corral your solder using some yellow ochre paint. It worked well for me. I'm not sure it needs to be yellow ochre after using and observing it. But that was what was recommended to me. Saves a lot on clean up on aisle 5.
Igitur qui desiderat pacem, praeparet bellum or party till the cows come home!
planohog
Swill Maker
Posts: 381
Joined: Mon Jun 17, 2024 2:18 pm
Location: Gulf_of_America

Re: new keg build, pictures

Post by planohog »

oh yes mop bucket aisle 5. ill try it on the bottom soldering I will be working this week.
User avatar
Yummyrum
Admin
Posts: 10595
Joined: Sat Jul 06, 2013 2:23 am
Location: Fraser Coast QLD Aussie

Re: new keg build, pictures

Post by Yummyrum »

planohog wrote: ↑Mon Aug 18, 2025 7:01 pm i found out you can use the acid brush to help move the solder around too.
:thumbup:

I noticed you were wearing your Solder dribble saving footware :ebiggrin:

Good job , those joints look very secure .
planohog
Swill Maker
Posts: 381
Joined: Mon Jun 17, 2024 2:18 pm
Location: Gulf_of_America

Re: new keg build, pictures

Post by planohog »

i do not recommend flipflops on this operation. probably should have changed, I have one more to do so I wont jinx myself.
planohog
Swill Maker
Posts: 381
Joined: Mon Jun 17, 2024 2:18 pm
Location: Gulf_of_America

Re: new keg build, pictures

Post by planohog »

I wanted to share the most important part of sodering on these flanges. Clean, Clean and Clean again. Then wrap the solder and soak with with flux, using the acid brush. This wrap of solder also helps hold the flux and as you heat the keg and the flang you will see when its melting. I did not clean clean and did not wrap the solder, tried to freehand it after using flux. did not work. Just made a mess that I had to clean up. here is the wrap on the bottom drain flange . set for 1" NPT.
IMG-1190.jpg
cleaned up and water tested. no leaks.
IMG-1191.jpg
IMG-1193.jpg
unable to boil test today, 1" npt valve leaks. another amaz part returned.
You do not have the required permissions to view the files attached to this post.
planohog
Swill Maker
Posts: 381
Joined: Mon Jun 17, 2024 2:18 pm
Location: Gulf_of_America

Re: new keg build, pictures

Post by planohog »

little bit of trouble, the distance from the 6" to the 3" is not enough
to get the clamp on the 6" at all.
Unsoldered the 3" letting it cool to reevaluate .
I maybe looking at moving the 3" inch hole down to accommodate
both clamps at the same time. acfixer69 saw this few days back.
I have not seen any repair posts, I suppose I could find some small stainless
plate and try and cover it up and redrill. Not sure what my options are here.
User avatar
Salt Must Flow
Master of Distillation
Posts: 3158
Joined: Sat Jan 29, 2022 2:06 pm
Location: Wuhan China (Novel Coronavirus Laboratory)

Re: new keg build, pictures

Post by Salt Must Flow »

planohog wrote: ↑Fri Aug 22, 2025 5:29 pm little bit of trouble, the distance from the 6" to the 3" is not enough
to get the clamp on the 6" at all.
Unsoldered the 3" letting it cool to reevaluate .
I maybe looking at moving the 3" inch hole down to accommodate
both clamps at the same time. acfixer69 saw this few days back.
I have not seen any repair posts, I suppose I could find some small stainless
plate and try and cover it up and redrill. Not sure what my options are here.
Yeah you really need to be sure both clamps can go on and either can be removed at any time.

You can buy copper plates or disks of all diameters and thicknesses. You can heat the copper plate/disk up red hot and quench it to anneal it. Now you can then place it over top of a domed part of a keg and pound it to shape using a rubber mallet to conform to the keg.
MooseMan
Master of Distillation
Posts: 3312
Joined: Fri May 28, 2021 4:54 am
Location: Wales UK

Re: new keg build, pictures

Post by MooseMan »

planohog wrote: ↑Fri Aug 22, 2025 5:29 pm little bit of trouble, the distance from the 6" to the 3" is not enough
to get the clamp on the 6" at all.
Unsoldered the 3" letting it cool to reevaluate .
I maybe looking at moving the 3" inch hole down to accommodate
both clamps at the same time. acfixer69 saw this few days back.
I have not seen any repair posts, I suppose I could find some small stainless
plate and try and cover it up and redrill. Not sure what my options are here.
This is a pretty easy fix mate, get some copper or stainless of the same/close diameter, or make a copper sleeve, you only need a short section.
Then solder that to the fitting to raise the 3" flange above the 6" flange.
That should give you enough clearance to get the clamps on.
Make Booze, not War!
planohog
Swill Maker
Posts: 381
Joined: Mon Jun 17, 2024 2:18 pm
Location: Gulf_of_America

Re: new keg build, pictures

Post by planohog »

That is a great idea
Tubing with 3 Inch Tri Clamp Ferrule Flange (Tube Length: 4 Inch /102MM) on the way.
MooseMan
Master of Distillation
Posts: 3312
Joined: Fri May 28, 2021 4:54 am
Location: Wales UK

Re: new keg build, pictures

Post by MooseMan »

planohog wrote: ↑Sat Aug 23, 2025 5:10 am That is a great idea
Tubing with 3 Inch Tri Clamp Ferrule Flange (Tube Length: 4 Inch /102MM) on the way.
You're welcome! :D
Make Booze, not War!
planohog
Swill Maker
Posts: 381
Joined: Mon Jun 17, 2024 2:18 pm
Location: Gulf_of_America

Re: new keg build, pictures

Post by planohog »

sneak peak, wow that was a chore getting that soldered on. I finally think i did, messy again.I was checking locations with my 6-2 bowl on there
with clamp. I hope to boil test tonight.
IMG-1213.jpg
You do not have the required permissions to view the files attached to this post.
User avatar
shadylane
Master of Distillation
Posts: 12902
Joined: Sat Oct 27, 2007 11:54 pm
Location: Hiding In the Boiler room of the Insane asylum

Re: new keg build, pictures

Post by shadylane »

Just a thought, that 6" fitting deserves several 6" bubble cap plates. :wink:
planohog
Swill Maker
Posts: 381
Joined: Mon Jun 17, 2024 2:18 pm
Location: Gulf_of_America

Re: new keg build, pictures

Post by planohog »

boil test on standby. Mrs has the dryer going and I got the look, :roll: I told her I will wait my turn,
User avatar
shadylane
Master of Distillation
Posts: 12902
Joined: Sat Oct 27, 2007 11:54 pm
Location: Hiding In the Boiler room of the Insane asylum

Re: new keg build, pictures

Post by shadylane »

If Mama ain't happy, nobodies happy.
And never piss off the cook. :lol:
planohog
Swill Maker
Posts: 381
Joined: Mon Jun 17, 2024 2:18 pm
Location: Gulf_of_America

Re: new keg build, pictures

Post by planohog »

filled it 1/2 , got it hot , cranked in 20 amps, it was bubbling pretty quick. First thing I noticed, is I need to wrap it up with insulation,
held down pressure on 3" , got a nice pop when the seal broke, did this manually so I did not explode hot water all over the house.
hand pressure only. Well I did not hear or see any leaks up top.
I also do not like my wheels, im going for the moving skates over at the big orange store. I had to put boards under the keg to get it off the floor.
The good news, im ready for the vinegar run. I wont bore y'all with any more pictures after this one. We can call it unit under test.
IMG-1220.jpg
You do not have the required permissions to view the files attached to this post.
MooseMan
Master of Distillation
Posts: 3312
Joined: Fri May 28, 2021 4:54 am
Location: Wales UK

Re: new keg build, pictures

Post by MooseMan »

planohog wrote: ↑Sun Aug 24, 2025 3:49 pm sneak peak, wow that was a chore getting that soldered on. I finally think i did, messy again.I was checking locations with my 6-2 bowl on there
with clamp. I hope to boil test tonight. IMG-1213.jpg
I'd call that a win!
Nicely done.

Yeah you want to get that thing well insulated, including top and bottom.
Makes a huge difference on stripping runs as the more energy you can get into the wash, the faster you'll strip.
Any heat that you can feel outside the boiler, is simply wasted energy.
Make Booze, not War!
User avatar
Rusty Ole Bucket
Posts: 667
Joined: Sat Jul 27, 2024 12:39 pm
Location: Well, I'm not sure.

Re: new keg build, pictures

Post by Rusty Ole Bucket »

That's a good looking keg build!


Rusty
"Knowledge is a paradox; the more one understands, the more one realizes the vastness of his ignorance" - Viktor (Arcane)

The Horny Goat Build
Electric Boozaloo II Build
Sailman
Rumrunner
Posts: 556
Joined: Wed Aug 21, 2019 7:02 am

Re: new keg build, pictures

Post by Sailman »

Yes, show definitely won't to insulate its a pain in the butt when you accidentally touch the side of one that's not insulated. I made the mistake of doing a run with no shoes on and my foot slipped and my big toe paid the price. Not too bad but it was enough to let me know that it needed to be insulated and definitely wear shoes.
You do not have the required permissions to view the files attached to this post.
planohog
Swill Maker
Posts: 381
Joined: Mon Jun 17, 2024 2:18 pm
Location: Gulf_of_America

Re: new keg build, pictures

Post by planohog »

I have some on order and going to try a circulating pump to get the setback in the sink, or 212F water into container. Do not solder in flipflops, the spashing on the ground will make you dance . :sarcasm:
planohog
Swill Maker
Posts: 381
Joined: Mon Jun 17, 2024 2:18 pm
Location: Gulf_of_America

Re: new keg build, pictures

Post by planohog »

somehow I developed a weird leak on the solderjoint on the very bottom. i am questioning my selection of a 1" npt. Its a real pain screwing all that together, nice clamp might be better. I figured it was going to be safer and seal better than a tri clamp. With a transfer pump and pipe on the end of it that assembly is large, makes it hard to break down. My boiler install will be temporary, if it were permanent that might work better using NPT.
Since I already have to and resolder , might be a good time to convert to tri clamp on the bottom. :?:
User avatar
Salt Must Flow
Master of Distillation
Posts: 3158
Joined: Sat Jan 29, 2022 2:06 pm
Location: Wuhan China (Novel Coronavirus Laboratory)

Re: new keg build, pictures

Post by Salt Must Flow »

planohog wrote: ↑Wed Aug 27, 2025 8:00 am somehow I developed a weird leak on the solderjoint on the very bottom. i am questioning my selection of a 1" npt. Its a real pain screwing all that together, nice clamp might be better. I figured it was going to be safer and seal better than a tri clamp. With a transfer pump and pipe on the end of it that assembly is large, makes it hard to break down. My boiler install will be temporary, if it were permanent that might work better using NPT.
Since I already have to and resolder , might be a good time to convert to tri clamp on the bottom. :?:
I fluxed & soldered the NPT joint (where the elbow meets the fitting that was soldered to the bottom of the keg) on some of my bottom drains. I figured why not? It's easy to do and eliminates any chance of any potential leaks there.

Here you can see the elbow soldered into the Weld Spud on the bottom of the keg.

1in Weld Spud 01.jpg


The alternative is to use PTFE tape. I've had stubborn threaded joints before and soldering them has been my solution when leaks persist.

Weld Spud 05.jpg
You do not have the required permissions to view the files attached to this post.
User avatar
shadylane
Master of Distillation
Posts: 12902
Joined: Sat Oct 27, 2007 11:54 pm
Location: Hiding In the Boiler room of the Insane asylum

Re: new keg build, pictures

Post by shadylane »

Here's the drain for an 18ish gallon pot.
I welded the 90* elbow directly to the bottom of the boiler.
You do not have the required permissions to view the files attached to this post.
planohog
Swill Maker
Posts: 381
Joined: Mon Jun 17, 2024 2:18 pm
Location: Gulf_of_America

Re: new keg build, pictures

Post by planohog »

shadylane wrote: ↑Wed Aug 27, 2025 5:30 pm Here's the drain for an 18ish gallon pot.
I welded the 90* elbow directly to the bottom of the boiler.
I reworked my solder joint, if I have to go again, I think ill try. this. then it will cut
down on the possibilities of water coming from the threads.
Very soon vinegar run.
User avatar
Copperhead road
Distiller
Posts: 2168
Joined: Thu Jan 12, 2017 4:28 pm
Location: Brisvegas downunder OZ

Re: new keg build, pictures

Post by Copperhead road »

planohog wrote: ↑Wed Aug 27, 2025 7:00 pm then it will cut
down on the possibilities of water coming from the threads.
My centre drain started leaking from the thread where the drain shaft screws into the elbow after a month or so, I then got it welded .
years ago when i had the boiler fabricated I had the 90° elbow welded to the keg. I should have screwed the drain shaft into the elbow before giving it to the engineering shop and had that end welded as well from the get-go.

At the time I thought the threaded end would be sufficient and not leak. I run gas so I suspect the expanding and contracting from heating up and cooling down is why it started leaking (that part of the drain glows “red” sitting above the HP Gas burner)

you will not regret getting all connections welded at the start of your boiler build totally eliminating the rigmarole of leaks later.IMO
Never mistake kindness for weakness....
User avatar
Corn Cracker
Posts: 1411
Joined: Sun Jun 13, 2021 7:25 am
Location: s.e. Texas

Re: new keg build, pictures

Post by Corn Cracker »

Nice build, it looks good, Plano
I think I'll go home and fire up my still, it might not make me feel better but, I bet it will
planohog
Swill Maker
Posts: 381
Joined: Mon Jun 17, 2024 2:18 pm
Location: Gulf_of_America

Re: new keg build, pictures

Post by planohog »

Thank you all for the comments and suggestions, I think I will build my parts list for the next guy that gets excited about this kind of project.
Everyone needs a good supply of boiling water to keep the shrimp and crawdads cooking at the party :)
planohog
Swill Maker
Posts: 381
Joined: Mon Jun 17, 2024 2:18 pm
Location: Gulf_of_America

Re: new keg build, pictures

Post by planohog »

few after the
Reflectix BP24025
I have a bunch extra, might do the top too. There is lots of spilage up there, not sure how that stuff is going to handle it.
IMG-1244.jpg
IMG-1246.jpg
IMG-1248.jpg
IMG-1249.jpg
You do not have the required permissions to view the files attached to this post.
Post Reply