My Reflux Design
Posted: Wed Dec 03, 2008 5:02 pm
All:
I've just finished drafting a design my VM reflux and wanted to solicit some feedback before I buy parts and start assembly. After reading liquordude's post http://homedistiller.org/forum/viewtopi ... &sk=t&sd=a I'm now wondering if I should consider adding a ferrule/clamp about 1' below the T and put my leibig on a 45 instead of a 90. This would give me a lower profile config for stripping runs, but I'm concerned about how hard getting those SS ferrules soldered to the copper will be.
Any other comments/suggests are very welcome!

-Thanks Mini for all the tips with my design thus far-
I've just finished drafting a design my VM reflux and wanted to solicit some feedback before I buy parts and start assembly. After reading liquordude's post http://homedistiller.org/forum/viewtopi ... &sk=t&sd=a I'm now wondering if I should consider adding a ferrule/clamp about 1' below the T and put my leibig on a 45 instead of a 90. This would give me a lower profile config for stripping runs, but I'm concerned about how hard getting those SS ferrules soldered to the copper will be.
Any other comments/suggests are very welcome!

-Thanks Mini for all the tips with my design thus far-