Page 1 of 1

This may be a Dumb Idea, but I was wondering

Posted: Sun Feb 20, 2011 3:47 pm
by shiner51
I have a basic column still, and I was wondering if anyone has ever thought about rigging the column or the boiler with a way to re- introduce your run back into the pot while it is still running. Instead of making a stripper run, and then rerunning everything, take what has been collected and return it back into the boiler through a tube that is valved at both ends. This may have been discussed some place on the forum but couldn't find it any place. Is this a practical idea or has it been done?