I’m planning a 2 stage attack on this build. I wouldn’t mind some feedback from the collective minds on this forum.
Stage 1 time expected: 1st quarter 2017
-reduce the connecting pipe from 28mm to 22mm, i can find competitive priced 22mm ball valves.
-install 2x 3kw immersion heaters in the boiler. looking at the calcs i estimate that the minimum vol left in the boiler ever after a run will be 10l so the lower element will need to be up to 10cm from the bottom of the tank. the other used during heat up will be under 25cm.
-rebuild my old column in to something new, 54mm to 34mm reducing pipe at a 45º angle to a 34mm vertical pipe down to Liebig.
-build a parrot. Seems a shame not to when i have all this scrap copper sitting around.
old column to be rebuilt
Stage 2 time expected: late 2017-early 2018
-build a 54mm connection between tank1 & tank2. plan is to have a shotgun-esk down pipe with v's cut in the bottom. my theory is if the boiler dose get sick there is more pipe so hopefully less chance of pressure build(complete speculation) the other reason further condensation/diffusion in to the thumpers charge.
-install a further immersion heater on tank2 to speed up heating times.
-build a 108mm column with 2 shotgun condensers. thinking early stages of a flute.
tare the plan apart if you spot any faults or issues and all feedback will be considered and contemplated.